Brand: CL
Model: ZBSX-92
Pictures are for reference only
The vibratory action produced by the power unit moves the sample over the sieve in a unique way producing faster more efficient sieving, while the rapid vertical movements also help keep the apertures from pegging. The digital controller is used to set both the processing time and amplitude setting while further control enables the vibration to run continuously or intermittently The shaker is fitted with a timer which can be pre-set for any duration up to 60 minutes. This unit will accept 12.7inch, 200mm and 300mm sieves dia. Wet sieving kits in the appropriate sizes can be used with this shaker. |
Main technical parameters
1. Screen diameter: 200mm 300mm
2 Screen stack height: 440mm
Sieve seat amplitude: 8mm3
Sieve shaking times: 221 times/min4.
Shock times: 147 times/min5.
Turn radius: mm6.
7. Motor model: A07142
8. Motor power: 0.37 kW
9. Motor speed: 1400 times/min
10. Overall dimensions: (length*width*height) 600*400*800 mm
11. Total weight: 120Kg
Working Principle
This machine is mainly composed of transmission, swing, shock, clamping mechanism and electrical components. The motor drives the gear through the main shaft transmission shaft, and the worm gear drives the cam. The main eccentric shaft drives the two auxiliary eccentric shafts, so that the seat has dual movements of rotation and shock.
Installation
This machine can be directly placed on the cement floor without cement foundation, or it can be installed on the cement foundation. The size of the foundation screw is as shown in the figure: its thickness is 300 mm. The height and size of the foundation exposed above the ground or level with the ground, depending on the specific use needs, install the circuit and ground according to the electrical regulations. After the installation is completed and the power is turned on, the motor rotates in the same direction as the arrow, and there is a shock movement. If it is the opposite, the motor runs idle. At this time, the terminal can be replaced before it can be started normally. 4. Operation and maintenance
Before starting the machine, unscrew the upper bolts and add enough lubricating oil. It is appropriate to use 5 kg of No. 20 ordinary engine oil. When installing the screen, first turn the tightening bolts to the left to loosen the screen cover fixing top rod, then lift it up together with the screen cover, and then turn it right to fix it. The screen can be placed on the tray.
.
Reviews
There are no reviews yet.